The prototype for the 63rd Street L structure has been completed and assembled:
I'm not yet sure how (or if) I'll incorporate this into the layout but its good to know I have the basic design done.And ... as I feel like I've been neglecting the actual layout for too long, I've started to try to finish some of the "landscape" under the L.
Since this is Met, through the near Southwest side, I'm going for a more "vacant lot" look under the structure. I do however, need to do a better job of camouflaging the wire for the station wiring ... please ignore (for now) the mess of red wiring.
I need to add more weed, bushes, and lots of garbage and assorted refuse.
No comments:
Post a Comment